Surgut 800 MW (2x400 MW) Combined Cycle Power Plant

E.ON is one of the world's largest investor-owned power and gas companies. E.ON has started to work on the construction of two new combined-cycle gas turbine units at its Surgutskaya GRES-2 power plant in Siberia in June 2008. The Surgutskaya GRES-2 power station is situated in the Tyumen region of Russia. The new highly-efficient gas turbines will become operational in December 2010, making the Surgutskaya thermal plant one of the highest capacity power stations in the world.

General Electric International Inc. and Gama Power Systems Engineering & Contracting Inc. are the EPC (Engineering, Procurement, Construction) Contractor of Surgut 800 MW Combined Cycle Power Plant.

Tri Morya was awarded contract by Gama Power Systems to execute the civil works in Surgutskaya GRES-2 power station including excavations, backfilling, burried networks, concrete works, sandwich panel and roof covering works.

Client: Gama Power Systems
Location: RF, Tumenskaya Oblast, Surgut
Contract date: 19.12.2008
Completion date: March 2010
Total construction area: Unit 7 & Unit 8 = 25.874 m2 + Gas Compressor Building Area= 4.642 m2