Shatura 400 MW Combined Cycle Power Plant (CCPP)-Shatura, Moscow

The consortium consisting of General Electric International Inc. and Gama Power Systems Engineering & Contracting Inc. became the prime contractor for construction of the PGU-400 combined cycle unit to replace outdated equipment at Shaturskaya state district power plant. The power project was included into the list of high-priority power sites of the Russian Unified Energy System.

Tri Morya was awarded contract by Gama Power Systems to execute the civil works including excavations, backfilling, burried networks, and concrete works.

Client: Gama Power Systems
Location: Shatura, Moscow Region, RF
Contract Date: 28.02.2008
Completion Date: November 2009
Total Construction Area: Main Building Area 15.300 m2 + Gas Compressor Building Area 3.340 m2= 18.640 m2